Monday, March 3, 2014

Two Week Recap

In the last two weeks we've accomplished a lot:
  • The drywall contractor finished the master bathroom, pantry and patched the cracks in the living room and master bedroom.  The cracks were from piering the foundation back in August.
  • The hardware in our kitchen was installed.
  • Dan and I painted the master bedroom and living room
  • The floor were finished in the office, living room and master closet
  • We painted and installed a lot of trim
  • AND we moved into the office and living room!!
Here's some photos of the house right now...


The "new" office looking south.


The "new" office looking south.
Living room with new floors and new paint.

 
 
Bedroom with new paint (walls used to be white).


 
 
Kitchen hardware

 
 
Sink/Vanity area of master bathroom with drywalling complete.
Toilet room of master bathroom with drywalling complete.

Shower area of master bathroom with drywalling complete.