I know, I know I am VERY behind on posting. Originally I was waiting for the contractors to finish
the garage before posting final pictures, but immediately after the contractors
left Dan and I jumped in and started working ourselves. For the last two months we've been spending
every evening working on the garage and as much of our weekend that we can
spare. But before I get to what we've
been working on, here’s the big reveal of the garage:
We've been really busy finishing the inside of the garage. Over the last month, we've insulated most of the exterior walls, added treads and risers to the stairs, had an air conditioner installed and painted an epoxy coating on the floor. We're currently in the process of moving our large items from the house into the garage so that we can get started on the house projects.
|
One of three stacks of insulation, before we cut it up and installed it. |
|
Progress Photo: Insulation installed in attic (two layers, one with the silver face on the exterior and the other with the silver face on the interior.) |
|
Progress Photo: Insulation and wall covering on north wall of first floor. |
|
Progress Photo: South attic wall insulated and covered with cedar plywood. In front is shelving that we built and have already filled full of building materials. |
|
Progress Photo: First floor prior to epoxy paint. |
|
Progress Photo: New stair treads and risers. |
|
Progress Photo: Epoxy floor complete! |